Streszczenie
The problem of the application of predetermined time systems in the reduction of changeover time is presented. Firstly, SMED method is described. Next, the medium batch production is indicated, as the optimal area of application of the developed methodology. MTM-UAS method is chosen as the optimal extension methodology SMED. Finally, practical aspects of the implementation of modified SMED methodology are discussed on the example of rim manufacturer.